It looks like LX is planning a new temporary (for the duration of the new Dock A construction) facility for both F and J passengers departing from ZRH with dedicated check-in and lounges.
It seems that the building will be south of the existing Dock B and all passengers will be driven to planes in cars (F) and business-busses (J).
Source here (aero telegraph)
It seems that the building will be south of the existing Dock B and all passengers will be driven to planes in cars (F) and business-busses (J).
Source here (aero telegraph)